Maintenance dredging
Sedimentation reduces the depth of port basins, jetty berths and shipping channels until vessels can no longer berth or pass safely. We restore that depth by grab dredging: a crane barge is positioned at the work area, its grab removes material from the seabed, and the material is loaded directly into a hopper barge moored alongside.
Our crane barges have 26–35 m booms and grab options from 4.5 to 12 m³, including heavy-duty and orange-peel grabs for heavier material.
Equipment
- Crane barge
- 4 units · 26–35 m boom
- Grab
- 4.5–12 m³ · heavy duty · orange peel
- Hopper barge
- 2 units · 3,200 m³
Sites we have worked on: shipping channels (West Kalimantan, Bangka Belitung, Central Java), port basins and container terminals (North Jakarta, Medan, Pontianak), and industrial and energy jetties (East Kalimantan, Riau, Batam, South Sumatra).
Work sites in the project explorer →